A partner handover checklist makes sure nothing gets lost when a link partner moves to a new person on your team. Usually, relationships live in one person’s inbox and memory. So this checklist turns that into a record the next person can act on from day one.

Free template

Partner handover checklist for link builders

Start freeGet the checklist

Free to download, no sign-up. Want partner records that never need handing over? No Commitment. No Credit Card Required.

Sample partner record with contact, deal terms, linked deals and notes, the details a partner handover checklist covers

Partner handover checklist

Use one copy per partner when a relationship moves to a new person. Tick each item, then add a note where something needs follow-up.

Item What to hand over Done (Y/N) Notes
Contacts Name, email and preferred channel for each person at the partner
Agreed terms What was agreed for each deal, such as followed links and target pages
Live links Every link with the partner, with its status from a fresh check
Open items Pitches, drafts or swaps in progress, with dates
Problems Lost links, slow replies or disputes, and where they stand
History notes Anything that explains the relationship, such as past favours or tensions
Introduction A short email introducing the new contact to the partner

Download the CSV

The CSV opens in Google Sheets, Excel or Numbers.

Why it matters

What a partner handover checklist prevents

People leave, but relationships should not leave with them.

Usually, a link builder knows each partner personally: who replies fast, what was agreed and which links are still owed. When that person leaves or changes role, most of that knowledge goes with them. So the new person starts from scratch, and partners notice.

Picture an agency where a senior builder moves to another team. Before she goes, she fills a partner handover checklist for each of her twelve partners. As a result, the new owner sends introductions in week one and picks up two open swaps without asking anyone.

Lost contacts

Names and emails live in one inbox, so they leave with the person.

Forgotten terms

Nobody else knows what was agreed.

Open items dropped

Pitches and swaps in progress stall.

The items

What the partner handover checklist covers

Seven items per partner.

  • Contacts: every person at the partner and how they prefer to talk.
  • Agreed terms: what was agreed for each deal.
  • Live links: every link, checked fresh.
  • Open items: work in progress, with dates.
  • Problems: lost links or disputes, and their status.
  • History and introduction: context, plus an email introducing the new contact.
Before the handover

Prepare the partner handover checklist early

A rushed last day loses details.

Start the checklist a week or two before the handover. First, check every live link with the partner, so the new owner inherits the real state. Then list open items and problems. Finally, write the introduction email together, so the partner hears about the change from someone they know.

  • Check: every link with the partner, before the last day.
  • List: open items and problems.
  • Introduce: old and new contact together.
Comparison of tracking partners by hand versus with Partners in SEOENV, which makes a partner handover checklist shorter
After the handover

Follow up after the partner handover checklist

The first month decides whether the relationship survives.

After the handover, the new owner should reply quickly and follow up on open items first. Also, keep notes in the same record, so the next handover is easier. In addition, our guide to staff turnover in link building covers the wider risks.

  • Reply fast: first impressions matter.
  • Close open items: before starting new ones.
  • Keep notes: in the partner record, so the next handover is easy.
Partners in SEOENV showing partner records, kept up to date after a partner handover checklist

Relationships belong to the team, not one inbox.

Write them down before anyone leaves.

What helps

SEOENV features for partner records

All of these are live in the app today.

Partners

One record per partner, with deals and notes.

Read about Partners

Link Tracker

Every link with the partner, with status.

Read about Link Tracker

Master Link Exchange

Both sides of every swap.

Read about Master Link Exchange

Check all

Fresh status before the handover.

Read about Check all

Why we wrote this

We have seen good partner relationships fade because one person left without a handover. A short checklist keeps them going.

Partner handover checklist and good records

The best partner handover checklist is a short one, because most details already sit in a shared record. If contacts, terms and links live in one place, the handover is mostly an introduction. Besides, our guide to link partner records explains what to keep, and our partner communication log guide covers notes.

Also, use the handover to review the relationship. If a partner has lost links or stopped replying, our guide on when to drop a link partner helps you decide. Finally, keep swaps relevant too, in line with Google’s spam policies.

FAQ

Questions about the partner handover checklist

What is a partner handover checklist?

A list of everything the next person needs to manage a link partner: contacts, terms, links, open items, problems and history.

When should I start the handover?

A week or two before the change, so nothing gets rushed.

Should I tell the partner?

Yes, and above all, introduce the new contact in a joint email.

Do I need to check links before handing over?

Yes, otherwise the new owner inherits problems they cannot see.

Can I keep partner records in SEOENV?

Yes, Partners keeps contacts, deals and notes in one record.

Keep partner records the whole team can see.

Store contacts, deals and links in one place.

Start free

No Commitment. No Credit Card Required.